IT Infrastructure · Garments
Dependable IT for Production, ERP and Payroll
Host ERP, payroll and file storage on reliable servers with backup and power protection.
- ERP & payroll servers
- Shared file storage
- Scheduled backups
- UPS protection
Recommended Deployment
One fixed device setup for Garments. The equipment list and products below follow it and nothing from another setup is mixed in.
Deployment type Local infrastructure
Recommended topology
- Workstations
- Network Switch
- Firewall
- Servers / Virtualization
- NAS / Backup Storage
- UPS + Rack
Garments: protect ERP and payroll servers with a UPS and a daily backup.
Equipment checklist
- Required Server, storage, backup target, UPS, firewall
- Conditional Rack, cooling, virtualization licenses
- Optional Monitoring, extended warranty
What to size
- Workload, CPU and memory
- Usable storage after RAID
- Backup size and retention
Sizes follow your site survey. The recommended setup below is already matched to this solution.
Choose Your Devices for Garments
Every option below is compatible with this solution and comes from different brands and models. Choose one per component.
ERP, payroll and shared files live on one reliable server with a daily backup to a separate NAS, all behind a UPS so production data survives power events.
Typical size: 1 host, 1 NAS, 1 UPS-backed rack.
Buying Guide
What to check at each step. Tap a step to open it; products are chosen above in “Choose Your Devices”.
Step 1: Workload requirements
Servers
Buying guide
List apps, users and growth.
Details
- Check before buying: Applications, users, growth
- Common mistake: Sizing for average load
Key specifications to compare
- Applications
- users
- VMs
- growth
Right product when
CPU, memory and storage have headroom for peak load.
Step 2: CPU, memory & storage
Servers
Buying guide
Size for peak load, not average.
Details
- Check before buying: CPU cores, memory, storage tiers
- Common mistake: No headroom for growth
Key specifications to compare
- CPU
- RAM
- storage
- RAID level
Right product when
CPU, memory and storage have headroom for peak load.
Step 3: Rack vs tower
Servers
Buying guide
Rack suits multiple servers.
Details
- Check before buying: Rack space, noise, expansion
- Common mistake: Towers in a crowded rack
Key specifications to compare
- Rack units
- bays
- expansion
Right product when
CPU, memory and storage have headroom for peak load.
Step 4: NAS / SAN
NAS & Storage
Buying guide
Use for shared files or virtual storage.
Details
- Check before buying: Capacity, protocols, drive bays
- Common mistake: NAS without a backup plan
Key specifications to compare
- Capacity
- bays
- protocols
- RAID
Right product when
Usable capacity after RAID covers data and backup.
Step 5: RAID & backup
NAS & Storage
Buying guide
Keep a separate backup copy.
Details
- Check before buying: Backup size, schedule, offsite copy
- Common mistake: Treating RAID as backup
Key specifications to compare
- Backup size
- schedule
- offsite copy
Right product when
Usable capacity after RAID covers data and backup.
Step 6: Virtualization
Servers
Buying guide
Check licenses and host capacity.
Details
- Check before buying: Host capacity and license terms
- Common mistake: Overcommitting memory
Key specifications to compare
- Host CPU/RAM
- license model
Right product when
CPU, memory and storage have headroom for peak load.
Step 7: UPS, rack & cooling
UPS & Racks
Buying guide
Plan runtime, airflow and redundancy.
Details
- Check before buying: Load in watts, airflow, runtime
- Common mistake: No cooling plan
Key specifications to compare
- UPS VA
- runtime
- cooling
Right product when
Runtime, airflow and rack space are verified.
Step 8: Monitoring & warranty
Firewalls & Monitoring
Buying guide
Alerts, maintenance and response times.
Details
- Check before buying: Alerts, warranty, response time
- Common mistake: No monitoring or spares
Key specifications to compare
- Alerts
- warranty
- response time
Right product when
Security throughput and alerting match the network.
Planning IT infrastructure for your factory?
Custom projects are quoted after consultation.
